No | Nama Peserta | K | SK | SB | B | A | T | ST | P | PT | HN | H | SH | SA | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | PT. DANRUS UTAMA ENGINEERING - 40.220.507.4-126.000 | 87,0 | 87,0 | 62,34 | Rp. 249.417.000,00 |
Rp. 249.417.000,00 |
Rp. 249.417.000,00 | 30,0 | 92,34 | ||||||||
2 | CV. POLO CONSULTANT - 01.801.407.6-121.000 | 100,0 | Tidak menghadiri Pembuktian Kualifikasi | ||||||||||||||
3 | CV. SADA NIOGA KONSULTAN - 02.874.625.3-121.000 | 99,87 | Tidak menghadiri Pembuktian Kualifikasi | ||||||||||||||
4 | CV. DANRU SEJAHTERA CONSULTANT - 96.959.324.3-126.000 | 100,0 | 100,0 | ||||||||||||||
5 | PT. PERSADA NUSANTARA CONSULTANT - 94.307.474.0-216.000 | 68,0 | Tidak menghadiri Pembuktian Kualifikasi | ||||||||||||||
6 | ALIFHA KONSULTAN - 02.439.316.7-126.001 | 100,0 | 100,0 | ||||||||||||||
7 | PT. RYAN SYAWAL CONSULTANT - 01.951.712.7-216.000 | 87,0 | 87,0 | ||||||||||||||
8 | CV. GEOTAMA TUNAS MANDIRI - 72.079.569.9-429.000 | ||||||||||||||||
9 | BABO CONSULTANT - 73.306.534.6-121.000 | ||||||||||||||||
10 | CV. GILLIAN SINAR JAYA - 62.473.310.1-126.000 | ||||||||||||||||
11 | CV. MOSES MANDIRI - 41.258.511.9-126.000 | ||||||||||||||||
12 | CV. SIRAO BALUGU UWUZATO - 39.683.914.4-126.000 | ||||||||||||||||
13 | CV. DEVERIAN KONSULTAN - 02.295.899.5-121.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak